Nexcom ICES 268 User Manual Page 75

  • Download
  • Add to my manuals
  • Print
  • Page
    / 96
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 74
Copyright © 2013 NEXCOM International Co., Ltd. All Rights Reserved.
61
ICEK 268-T2 Starter Kit User Manual
Chapter 3: System Setup
There is a metal plate supporting the mainboard that can be lifted up or
lowered down. The instructions below illustrate the step-by-step procedures.
NOTE: Before lifting up or lowering down, make sure the two spring-nuts
located on the left and right side of the metal support plate are inserted/
closed to the end-position as depicted in the diagram below.
Left spring-nut Right spring-nut
1. Hold on the left and right spring-nuts using both hands, and pull out
the spring-nuts to lift up or lower down.
2. After lifting up the mainboard, make sure the two spring-nuts are
inserted and closed to the end-position before plugging
any connectors and I/O cards, then power on the system.
3. After lowering down the mainboard, make sure the two spring-nuts
are inserted and closed to the end position before powering off the
system and closing the cover.
Page view 74
1 2 ... 70 71 72 73 74 75 76 77 78 79 80 ... 95 96

Comments to this Manuals

No comments